Complications can become opportunities

Being brought into a project halfway through its development can be a delicate place to start, but our mission to uphold the highest safety standards enabled us to view complexity as an opportunity to showcase our diligence and capabilities.

The Challenge
In the construction industry, unforeseen challenges are inevitable, but some are more complex than others. During a recent project we were contacted after the sudden bankruptcy of one of the fire contractor companies. Not only did this present takeover difficulties and technical challenges, there were intricate time and project management issues that needed urgent addressing.

The existing fire system contract had been divided into two – the first contract (shell & core) covered the landlord areas, while the second contract (fit-out) focused on the apartments and residential communal areas. This contract split brought with it budgeting issues, time constraints, the possibility of legislative compliance complications and most importantly the risk of complete project derailment.

With so many moving parts it was imperative to tackle the project with diligence and razor sharp focus.


Solution
We started by meeting with key stakeholders to ensure they had clear visibility on tension points and delivery issues. Transparency is one of our key values, and shapes the way we work.

Our immediate intervention was then needed in the fit-out contract, to ensure the project could still be delivered on time and that the operational requirements and compliance BS5839-1 and BS5839-6 standards, which govern fire alarm system design certification, were maintained and on point.

To ensure this, we set out a clear plan to:

  • Conduct a detailed review of employer requirements, fire strategy, and design information up to that point.
  • Perform intrusive site surveys to establish a firm foundation for design certification.
  • Prepare a comprehensive report outlining findings and recommendations to ensure compliant systems.
  • Develop and submit design certifications in line with BS5839-1 and BS5839-6.
  • Offer ongoing professional indemnity insurance coverage for six years post-completion.

It was also important to make sure both the shell & core and the fit-out contracts didn’t deviate from legislative standards. We proposed a verification process to ensure full compliance involving:

  • A thorough review of technical submittals, layout drawings, system schematics, and fire strategy documentation.
  • Additional site surveys to verify design proposals.
  • A complete assessment of installation and commissioning procedures, ensuring strict adherence to BS5839.
  • Conducting a gap analysis to identify non-compliance issues and necessary corrective actions.
  • Developing and presenting verification certifications for both the shell & core and fit-out fire systems.

Conclusion

With an open, detailed and diligent approach we successfully prevented a potential project failure. Our leadership skills and comprehensive services enabled us to navigate the complexities of this project with safety, transforming it into an opportunity to showcase our excellence.

Looking for a fire safety partner?

We exist to protect people and places with precision. Whether your project is at the design, build or protect stage, get in touch to find out how we can work together.

info@onpointassociates.co.uk
020 8698 6295

On Point Associates
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.